Garrison Minerals | Industrial Mineral Processing / Wastewater Treatment
The Challenge
Garrison Minerals needed two industrial control panels for a wastewater treatment system. A first-time panel designer faced a critical obstacle: expensive integrator quotes created paralysis, while DIY design felt impossible without expertise. The project had stalled for months until they found an alternative path.
Panel Specifications (2 Identical Units)
Input:
480V 3-phase industrial powerOutput:
Multi-voltage control distributionSafety subsystems:
Redundant contactors, safety relay, hardwired e-stopEnvironmental rating:
Harsh weather and outdoor rated for continuous operationPower management:
Battery backup for failsafe shutdownControl systems:
Wireless control integration, built-in HMI, hardwired start/stop buttonsActuators:
Dual VFDs (pump + motor control)Valve actuation:
12 solenoid valves per panelTemperature management:
Internal temperature control and monitoring
How Blitzpanel Helped
Mike designed both panels in our software with comprehensive support from our engineering team, ensuring every decision met safety and compliance standards. We validated the design for harsh industrial environments, then manufactured, assembled, and tested both units in a single week. Total timeline: idea to shipment in under 14 days.
The Results
Fast deployment
14 days from concept to two fully operational industrial panelsComplexity mastered
Handled 480V distribution, redundant safety systems, temperature monitoring, VFD coordinationReliability
Outdoor-rated system ready for harsh conditions without field modifications
Cost
Fraction of traditional integrator quotes while maintaining industrial-grade quality
We got sophisticated panels designed and built faster than we expected, without the integrator markup.
For facility operators and manufacturers managing critical infrastructure, traditional integrators create artificial friction: high costs, long timelines, and limited control. When a non-specialist can design complex systems themselves with proper guidance, and ship production panels in weeks instead of months, the economics and timelines of industrial operations fundamentally change.